beautypg.com

Allied Telesis ALLIEDVIEW-UM 1.6 User Manual

Page 123

background image

Allied Telesis

AlliedView-UM

1.6

User's Guide

PN 613-000381 Rev B

Page 123 of 129

ƒ

Current Properties

– These are the properties of the operation that will be rolled back.

ƒ

Target Properties

– These are the properties of the operation that will be performed for the rollback

operation.

3. Click the

button to perform the rollback.

4. When the rollback operation is complete, a “Rollback successful” message will be displayed. If the

rollback failed, a “Rollback failed” message will be displayed instead. For more details on the results of

the Rollback operation, you may view the Operation Logs pane.