beautypg.com

Allied Telesis AT-x510DP-52GTX User Manual

Page 96

background image

Chapter 7: Cabling the Stacking Ports

96

7. Position the transceiver with the release tab on the bottom and slide it

into the slot until it clicks into place, as shown in Figure 59 on page 96.

Figure 59. Installing the AT-StackXS/1.0 Transceiver in Slot S2

8. Repeat this procedure to connect additional switches to the stack with

AT-StackXS/1.0 transceivers.

9. To create the redundant path with the ring topology shown in Figure 15

on page 42 and Figure 16 on page 43, connect a stacking cable to the
empty stacking slots on the top and bottom switches.

10. After connecting the stacking cables to all the switches, go to Chapter

8, “Powering On the Stack” on page 101.

S2

/28

S1

/27

26

25

CON

SO

LE

SFP+

2685