beautypg.com

Allied Telesis AT-x510DP-52GTX User Manual

Page 66

background image

Chapter 4: Installing the Switch and its Power Supplies

66

5. While another person holds the switch in the equipment rack, secure it

using standard equipment rack screws (not provided), as shown in
Figure 28 for horizontal mounting and Figure 29 for vertical mounting.

Figure 28. Mounting the Switch Horizontally in an Equipment Rack

Figure 29. Mounting the Switch Vertically in an Equipment Rack

6. If required, repeat this procedure to install the remaining switches in

the stack.

7. Apply power to the switch or switches, as described in the following

procedures.

S2

/28

S1/27

26

25

CO

NS

OL

E

SFP

+

x510DP-52GTX

FDX

HDX

COL

1000

LIN

K

ACT

10/100

LIN

K

AC

T

3

5

1

7

9

11

13

15

17

19

21

23

4

6

8

10

12

2

16

18

20

14

22

24

27

29

25

31

33

35

37

39

41

43

45

47

28

30

32

34

36

26

40

42

44

38

46

48

2674

S2/52

S1/51

50

49

CONSOLE

x510DP-52GTX

SFP+

FDX

HDX COL

1000 LINK

AC
T

10/100 LINK

AC
T

35

17

9

1

1

1

3

1

5

1

7

1

9

2

1

2

3

4

6

8

10

12

2

16

18

20

14

22

24

27

29

25

31

33

35

37

39

41

43

45

47

28

30

32

34

36

26

40

42

44

38

46

48