beautypg.com

Allied Telesis AT-x510DP-52GTX User Manual

Page 105

background image

x510DP-52GTX Installation Guide

105

2. Wait two or three minutes for the switches to select a master switch

and to assign the ID numbers.

At this point, the stack is operational. The ID numbers are
automatically stored in special files in the flash memories of the
switches and are retained by the devices even if you reset or power
cycle the stack.

3. To continue with the installation, go to “Verifying the Stack” on

page 106.