Installing the switch in an equipment rack, This procedure requires the following items, Twelve bracket screws (included with the switch) – Allied Telesis AT-x510DP-52GTX User Manual
Page 64: Flat-head screwdriver (not provided), Cross-head screwdriver (not provided)

Chapter 4: Installing the Switch and its Power Supplies
64
Installing the Switch in an Equipment Rack
This procedure requires the following items:
Twelve bracket screws (included with the switch)
Two equipment rack brackets (included with the switch)
Flat-head screwdriver (not provided)
Cross-head screwdriver (not provided)
Four standard equipment rack screws (not provided)
Installation guidelines may be found in “Choosing a Site for the Switches”
on page 52. Here is the procedure for installing the switch horizontally or
vertically in a 19-inch equipment rack.
Caution
The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack. E28
1. Place the unit upside down on a level, secure surface.
Figure 25. Turning the Switch Upside Down
2. Using a flat-head screwdriver, pry the rubber feet from the bottom of
the switch, as shown in Figure 26.
Figure 26. Removing the Rubber Feet
2668
S2/52
S1/51
50
49
CONSOLE
x510DP-52GTX
SFP+
FDX
HDX COL
1000 LINK
ACT
10/100 LINK
ACT
3
5
1
7
9
11
13
15
17
19
21
23
4
6
8
10
12
2
16
18
20
14
22
24
27
29
25
31
33
35
37
39
41
43
45
47
28
30
32
34
36
26
40
42
44
38
46
48
2669
x510DP-52GTX
3
5
1
7
9
11
4
6
8
10
12
2