Chatsworth Products Hot Aisle Containment User Manual
Page 17
![background image](/manuals/415774/17/background.png)
BTS Aisle Containment Manual, Rev. 1.0
___
December 2013
Chatsworth Products
17
7. Add vertical extrusions every 48” (1200 mm) or at a smaller even interval across the
length of the duct. Use two gussets with two screws each to secure each vertical
extrusion as shown below. The flat side of the extrusion faces the inside of the duct.
This view is from the
outside of the
containment/duct.
The flat side of the
extrusions face the
inside of the
duct/containiment.