Chatsworth Products Hot Aisle Containment User Manual
Page 10
BTS Aisle Containment Manual, Rev. 1.0
___
December 2013
Chatsworth Products
10
ASSEMBLING THE BUILD TO SPEC KIT - The following sections cover recommended
assembly and installation methods. Use alternate methods or order of assembly as required.
Step 1: Join Extrusions to form the bottom, sides of the
duct and support from ceiling or top of cabinets.
Step 2: Level the sides and connect the ends to
form the bottom of the duct.
Step 3: Cut and install vertical supports at
each corner.
Step 4: Cut and install cross braces and intermediate
vertical supports.
Step 5: Cut and install the frame and cross braces at the
top of the duct.
Step 6: Cut, fit and install the panels. You may also
need to add drop panels and end fascias.