beautypg.com

Installing the casters, Installing the tower bezel – HP ProLiant ML570 G4 Server User Manual

Page 74

background image

Hardware options installation 74

Installing the casters

Use a T-15 Torx screwdriver to install the three T-15 Torx screws into each of the four casters.

Installing the tower bezel

1.

Set the server in its upright tower position.

CAUTION: Be sure to lock the casters and have the access panel in place before turning or reorienting the

server position.

2.

Install the two retention clips on the front of the server.

3.

Line up the hinges of the tower bezel with the corresponding slots on the chassis and slide the hinges
onto the pins.

4.

Close the front bezel.

5.

Install the power supply, if applicable ("

Redundant hot-plug power supply option

" on page

62

).

6.

Install the hard drives, if applicable ("

Installing a hot-plug SAS or SATA hard drive

" on page

55

).