beautypg.com

HP ProLiant ML570 G4 Server User Manual

Page 50

background image

Hardware options installation 50

Install a DIMM.

8.

Align the memory board with the memory slot and memory board guide clips.

9.

Install the memory board and close the ejector lever.

10.

Move the locking switch to the locked position.

NOTE: In hot-plug procedures, all LEDs now turn off except the board status LED, which flashes green while

the board is rebuilding. This process may take several minutes.

11.

Observe the memory board LEDs to be sure that the memory is functioning properly ("

Memory board

LEDs and components

" on page

17

). The LED states are valid when the memory board has finished

rebuilding.

12.

Install the access panel (on page

27

).

13.

Do one of the following:
— Install and lock the bezel.
— Slide the server back into the rack.