Operations, Power up the server, Power down the server – HP ProLiant DL360 G7 Server User Manual
Page 18: Extend the server from the rack
Operations 18
Operations
Power up the server
To power up the server, press the Power On/Standby button.
Power down the server
WARNING:
To reduce the risk of personal injury, electric shock, or damage to the equipment,
remove the power cord to remove power from the server. The front panel Power On/Standby
button does not completely shut off system power. Portions of the power supply and some internal
circuitry remain active until AC power is removed.
IMPORTANT:
If installing a hot-plug device, it is not necessary to power down the server.
1.
Back up the server data.
2.
Shut down the operating system as directed by the operating system documentation.
3.
If the server is installed in a rack, press the UID LED button on the front panel. Blue LEDs illuminate on the
front and rear panels of the server.
4.
Press the Power On/Standby button to place the server in standby mode. When the server activates
standby power mode, the system power LED changes to amber.
5.
If the server is installed in a rack, locate the server by identifying the illuminated rear UID LED button.
6.
Disconnect the power cords.
The system is now without power.
Extend the server from the rack
NOTE:
If the optional cable management arm option is installed, you can extend the server
without powering down the server or disconnecting peripheral cables and power cords. These
steps are only necessary with the standard cable management solution.
1.
Power down the server (on page
2.
Disconnect all peripheral cables and power cords.
3.
Loosen the front panel thumbscrews.
4.
Extend the server on the rack rails until the server rail-release latches engage.
WARNING:
To reduce the risk of personal injury or equipment damage, be sure that the rack is
adequately stabilized before extending a component from the rack.
WARNING:
To reduce the risk of personal injury, be careful when pressing the server rail-release
latches and sliding the server into the rack. The sliding rails could pinch your fingers.