Grounding requirements, Grounding requirements -6 – HP ProLiant DL585 Server User Manual
Page 29
Server setup
3-6
HP ProLiant DL585 Server User Guide
Grounding requirements
For proper operation and safety, the server must be properly grounded. In the United
States, you must install the equipment in accordance with NFPA 70, 1999 Edition
(National Electrical Code) Article 250, as well as any local and regional building
codes. In Canada, the equipment must be installed in accordance with Canadian
Standards Association, CSA C22.1, Canadian Electrical Code. In all other countries,
the installation must follow any regional or national electrical wiring codes, such as
the International Electrotechnical Commission (IEC) 364, parts 1 through 7.
Furthermore, you must ensure that all power distribution devices used in the
installation—such as branch wiring and receptacles—are listed or certified
grounding-type devices.
Because of the high ground leakage currents associated with multiple servers
connected to the same power source, HP recommends the use of a power distribution
unit (PDU) that is either permanently wired to the branch circuit of the building or
includes a non-detachable cord that is wired to an industrial-style plug. NEMA
locking-style plugs or those complying with IEC 60309 are considered suitable for
this purpose. HP does not recommend using common power outlet strips for this
equipment.