beautypg.com

American Dryer Corp. AD-15 Phase 7 User Manual

Page 24

background image

22

American Dryer Corp.

113243-1

PROCEDURE FOR

FUNCTIONAL CHECK OF

REPLACEMENT

COMPONENTS

Microprocessor Controller (Computer) Board

Phase 7 Coin Models

•

Upon completing installation of the replacement

microprocessor controller (computer) board,

reestablish power to the dryer.

•

Start the drying cycle by pressing any temperature

selection keys (HI, MED, or LO).

•

Verify that the applicable indicator lights on the

microprocessor controller (computer) board are

lit. (Refer to the illustration below.)

Phase 7 Non-Coin Models

•

Upon completing installation of the replacement

microprocessor controller (computer) board,

reestablish power to the dryer.

•

Start the drying cycle by pressing any of the preset

cycles in letters A-F.

•

Verify that the applicable indicator lights on the

microprocessor controller (computer) board are

lit. (Refer to the illustration below.)