beautypg.com

American Dryer Corp. AD-15 Phase 7 User Manual

Page 13

background image

113243-1

www.amdry.com

11

The neutral will only be used on 4-wire service. This is typical

for 380-416V, 50 Hz.

Electrically Heated Models Only

The only electrical input connections to the dryer are the

3-phase (3ø) power leads (L1, L2, L3, and sometimes neutral)

and ground. Single-phase (1ø) power for the control circuit

and for any single-phase (1ø) motors (if present) is done

internally to the dryer by the factory at the oven contactor. No

single-phase (1ø) input connection is required on a 3-phase

(3ø) dryer.

CAUTION:

The dryer must be grounded. A ground lug has

been provided for this purpose.

Input connection wiring must be sized properly to handle the

dryer’s current draw. This information is printed on the dryer’s

data label.

The electrical input connections are made at the electric oven

contactor located inside the assembly at the rear center upper

section of the dryer. The ground connection is made to a

copper lug also provided in this area. To gain access, remove

oven rear service cover.

IMPORTANT:

A strain relief must be used where the input

wiring enters the oven assembly.

A ground lug is provided in the rear electrical box to connect

your service ground.

3-Phase (3ø) Wiring Connections/Hookup

The electrical connections on ALL 3-phase (3ø) gas and

steam dryers are made into the rear service box located at

the upper left area of the dryer. The electrical connections

are made at the power distribution block located in the service

box. The ground connection is made to the copper lug, also

provided in this box. To gain access, the service box cover

must be removed.

For 208-230/240V Applications

!

!