beautypg.com

1 maintenance intervals, 2 removing the shear plate (dd feeder only) – Sterlco S-150 Digital Dosing Controller User Manual

Page 46

background image

Digital Dosing Units

46

Figure

Section 5: Maintenance

5.1 Maintenance Intervals

Daily:

Check warning signs on equipment for good legibility

and completeness.

Weekly:

Check function of the “On/Off” Switch.

Every 3
months:

Check shear plate in “DD” dosing station, and wiper in

“DT” dosing station.

Every 6
months:

Check that all electrical and mechanical connections

are tight.

Check adjustment of the level probes (optional).

Annually:

Check dosing disc in dosing station DD/DT.

Each time
after
material
Is changed:

Clean the dosing station.

Check shear plate or wiper.

Check dosing disc.

5.2 Removing the Shear plate (DD feeder only)

Removing the shear plate

1. Empty the dosing

station.

2. Open the profile clamp

(B) on the dosing

hopper.

3. Remove the dosing

hopper from the dosing

unit.

4. Open the safety screws

at the toggle-type

fasteners.

5. Open the toggle-type fasteners on the dosing motor.