beautypg.com

0 maintenance, 1 maintenance schedule – Seed Hawk AIRCART 2014 User Manual

Page 23

background image

SEED HAWK

®

2014 AIRCART OPERATOR’S MANUAL

SEED HAWK

®

2014 AIRCART OPERATOR’S MANUAL

38

39

Item

Frequency

(hours)

Service

Notes

Wheel Hubs & Main
Frame

100

100 hrs or annually re-pack
bearings or two pumps grease

Metering System
Shaft

25

100 hrs or start and end of
season. Grease ports and
motor/shaft connection.

Metering
Components

100

100 hrs or before seeding, or
between product changes

Fan System Intake

10

10 hrs or daily (remove
accumulated debris)

Fan System &
Fan Blades

10

10 hrs or daily (must
be intact and clean)

Fill Auger / Conveyor
System

100

When changing between
products, or when stored for
long periods of time

Tanks & Meters

100

When changing between
products, or when stored for
long periods of time

Fill Auger System
Pillow Block Bearings

10/100

10 hrs or daily, and
100 hrs or annually

Fill Auger System
Universal Joints

10/100

10 hrs or daily, and 100 hr or
annually

Hydraulic Return
Line

100

At end of seeding season, or
when stored for long periods
of time

Tires & Air Pressure

10

10 hrs or daily (inflate to 
proper pressure)

5.0 Maintenance

5.1 Maintenance Schedule

NOTE: The bearings on each

Stainless Steel meter are

sealed. DO NOT GREASE

THESE BEARINGS.

Check

Clean

Lube