0 maintenance, 1 maintenance schedule – Seed Hawk AIRCART 2014 User Manual
Page 23
![background image](/manuals/364503/23/background.png)
SEED HAWK
®
2014 AIRCART OPERATOR’S MANUAL
SEED HAWK
®
2014 AIRCART OPERATOR’S MANUAL
38
39
Item
Frequency
(hours)
Service
Notes
Wheel Hubs & Main
Frame
100
100 hrs or annually re-pack
bearings or two pumps grease
Metering System
Shaft
25
100 hrs or start and end of
season. Grease ports and
motor/shaft connection.
Metering
Components
100
100 hrs or before seeding, or
between product changes
Fan System Intake
10
10 hrs or daily (remove
accumulated debris)
Fan System &
Fan Blades
10
10 hrs or daily (must
be intact and clean)
Fill Auger / Conveyor
System
100
When changing between
products, or when stored for
long periods of time
Tanks & Meters
100
When changing between
products, or when stored for
long periods of time
Fill Auger System
Pillow Block Bearings
10/100
10 hrs or daily, and
100 hrs or annually
Fill Auger System
Universal Joints
10/100
10 hrs or daily, and 100 hr or
annually
Hydraulic Return
Line
100
At end of seeding season, or
when stored for long periods
of time
Tires & Air Pressure
10
10 hrs or daily (inflate to
proper pressure)
5.0 Maintenance
5.1 Maintenance Schedule
NOTE: The bearings on each
Stainless Steel meter are
sealed. DO NOT GREASE
THESE BEARINGS.
Check
Clean
Lube