beautypg.com

Preliminary procedure, Procedure – Teledyne LeCroy ADP300_305 User Manual

Page 27

background image

Operator’s Manual

Preliminary Procedure

1. Connect the ADP30x under test to the female end of the ProBus Extension

Cable. Connect the male end of the ProBus Extension Cable to any channel

of the oscilloscope.

2. Turn the oscilloscope on and allow at least 30 minutes warm-up time

before performing the Certification Procedure.

3. Turn on the other test equipment and allow these to warm up for the time

recommended by the manufacturer.

4. While the instruments are reaching operating temperature, make a

photocopy of the Performance Verification Test Record (located in

Appendix A), and fill in the necessary data.

Procedure

1. Set the function generator to sine wave, 70 Hz, and an output voltage of

approximately 7.00 V rms (into a high impedance output).

2. Set the DMM to measure AC Volts.
3. Connect the function generator output to the DMM, using a BNC cable and

a female BNC to dual banana plug adapter.

4. Adjust the function generator output voltage until the DMM reads 7.000 V

±0.01 V.

5. Record the DMM reading to 1 mV resolution in the Test Record.
6. Disconnect the BNC cable from the function generator and from the BNC-

to-banana plug adapter on the DMM. (Leave the banana plug adapter

connected to the DMM).

7. Connect the BNC connector from the probe under test to the BNC-to-

banana plug adapter on the DMM.

8. Connect the insulated banana plug adapter to the function generator.
9. Using the insulated banana couplers, connect the positive lead (

Red

) of the

probe under test to the positive output of the BNC-to-banana plug adapter

and the negative lead (

Blue

) to the negative or return output.

10. Set the oscilloscope scale factor to 20 V/div.

923079-00 Rev A

23