Maintenance/inspection, 1 inspection items and schedule – IAI America RCS2-RTC12L User Manual
Page 46
40
10. Maintenance/Inspection
10. Maintenance/Inspection
Daily and periodic inspections are essential to making sure your actuator will operate safely and efficiently.
Before carrying out each inspection, check the applicable maintenance/inspection items listed below.
10.1 Inspection Items and Schedule
Conduct visual inspection and add grease at the applicable schedules specified below.
The following schedule is based on eight hours of operation daily. If the actuator is operated at a higher
utilization rate, including when it is operated continuously day and night, shorten the inspection intervals
as necessary.
Visual
inspection
Greasing of hollow
rotary actuator
At startup inspection
{
1 month after start of operation
{
6 months after start of operation
{
1 year after start of operation
{
{
Every 6 months thereafter
{
Every year thereafter
{
{
* Any adjustments requiring the following operations must be carried out at our factory. Do not
disassemble the actuator or cut any of its cables in the location where the actuator is installed.
x Disassemble the motor
x Disassemble the gear
x Disassemble the bearing
x Cut a cable
If the user has disassembled any of the above components or cut any of the actuator’s cables, IAI will
not be responsible for any malfunction or problem that may occur thereafter.
Warning:
x Performing inspection or maintenance work without a thorough understanding of the
specific tasks involved may result in a serial accident.
x If inspection is not carried out regularly, the drive part may reach its life prematurely or
the actuator may suddenly start malfunctioning.