Controlled Products Systems Group 1602-090 User Manual
Page 3

1601-065-L-3-13
1
SPECIFICATIONS
2-3
Safety Information for Vertical Barrier Arm
UL325 Entrapment Protection
4-5
6
SECTION 1 - INSTALLATION
7
7
8
8
1.1 Underground Conduit Requirements
1.2 New Concrete Pad
1.3 Trenching Existing Concrete
SECTION 2 - WIRING
9
9
9
10
11
12
13
2.1 High Voltage Wire Runs
2.2 High Voltage Terminal Connections
2.3 Dual Gate Operators (Primary/Secondary)
2.4 Main
Terminal
Description
2.5 Control
Wiring
2.6 P.A.M.S. Multiple Gate Operator Sequencing
SECTION 8 - TECHNICAL INSTRUCTIONS
33
8.1 Maintenance
Schedule
8.2 Diagnostics
Check
8.3 Troubleshooting
8.4 Accessories Parts List
Wiring Schematics
33
34
34-35
36
37-38
SECTION 4 - ARM INSTALLATION
19
4.1 Mounting
Hub
(
s
)
4.2 Mounting
Arm
(
s
)
4.3 1602 3-Piece Arm Assemblies
19
20
20
SECTION 5 - ADJUSTMENTS
21
5.1 1601 Circuit Board Description and Adjustments
5.2 DIP-Switch SW 1 and SW 2 Settings
5.3 Reverse Arm UP and DOWN Positions
5.4 Magnetic Limit Adjustment
5.5 Reverse Sensor Adjustment
5.6 Manual Operation of the Arm
21
22-24
25
26
26
27
SECTION 6 - OPTIONAL CONVENIENCE OPEN SYSTEM
28
6.1 Operating
Mode
6.2 DC System Description
6.3 DIP-Switch Settings
28
29
29
SECTION 7 - OPTIONAL ACCESSORIES INSTALLATION
30
7.1 Contact Sensor (Reversing Edge)
7.2 Fan
Kit
7.3 Heater
Kit
30
31
32
TABLE OF CONTENTS
SECTION 3 - LOOP DETECTOR LANE SETUPS
14
15
16
17
18
3.1 Entry Lane Only
3.2 Exit Lane Only
3.3 2-Way Traffic Lane
3.4 Ticket Spitter Entry Lane
3.5 Operator Timer ON Entry Lane (No Down Loop)
14