beautypg.com

Servicing 6200 valve – Hydrotech 6200 SXT Automatic Meter Initiated Water Softener User Manual

Page 24

background image

23

Servicing 6200 Valve

Before Servicing

1. Turn off water supply to conditioner :

a. If the conditioner installation has a 3 valve bypass system first open the valve in the bypass line, then close the valves at

the conditioner inlet & outlet.

b. If the conditioner has an integral bypass valve, put it in the bypass position.

c. If there is only a shut-off valve near the conditioner inlet, close it.

2. Relieve water pressure in the conditioner by stepping the control into the backwash position momentarily. Return the

control to the In Service position. (Refer to programming instructions)

3. Unplug Electrical Cord from outlet.

4. Disconnect brine tube and drain line connections.

WARNING! ELECTRICAL SHOCK HAZARD! UNPLUG THE UNIT BEFORE REMOVING THE COVER OR ACCESSING ANY

INTERNAL CONTROL PARTS.

CAUTION! Disassembly while under pressure can result in flooding. Always follow these steps prior

to servicing the valve.