Checklist/maintenance schedule – FlexLink X45 (43 мм) Тех. обслуживание User Manual
Page 18
18
Checklist/maintenance schedule
Checklist/maintenance schedule
No.
General checks
Number of operating hours/time interval
See page
1.
Check roller chain, sprocket, chain tension and lubrica-
tion of drive unit
50
250
500
Then every 500 hours
Page 8
2.
Check/adjustment of slip clutch
Every 1 000 hours
Page 6
3.
Check conveyor chain guides in drive units and idler
ends
Every 1 000 hours
Page 8
4.
Check tension of conveyor chain
50
250
500
Then every 500 hours
Page 9
5.
Check slide rails
Every 250 hours
Page 11
6.
Check slide rails, conveyor chain removed.
Every 2 000 hours, or at least once a year
Page 11
7.
Check slide rails in plain bends.
Every 500 hours
Page 11
8.
Check safety and security devices
At least once a year
Page 12
This manual is related to the following products:
- X45H (43 мм) Тех. обслуживание XS (45 мм) Тех. обслуживание XL (65 мм) Тех. обслуживание X85 (85 мм) Тех. обслуживание XH (105 мм) Тех. обслуживание XK (105 мм) Тех. обслуживание X180 (182 мм) Тех. обслуживание X300 (300 мм) Тех. обслуживание XW (300–1200 мм) Тех. обслуживание X45E (макс. 250 г) Тех. обслуживание XL (макс. 3 кг) Тех. обслуживание X85 (макс. 10 кг) Тех. обслуживание XK (макс. 30 кг) Тех. обслуживание