To switch on power to the system – Atec Agilent-85133F User Manual
Page 87

Installing the System
2
Installation and User’s Guide
87
To switch on power to the system
N O T E
Proper system operation is dependent on the sequence in which the
system components are switched on.
To switch on power to the system
Step
Notes
1 Ensure that the individual instruments are
configured to match the available line power
source.
*
•
For information regarding line power
settings, refer to the individual instrument
manuals.
2 Ensure that all component line power
switches are set to the OFF position.
3 Connect the system to line power.
4 Switch the rack cabinet ~ Line switch from
to
(from standby to energized).
5 Switch on the low leakage switch mainframe
line power.
6 Switch on the precision LCR meter line
power.
7 If present, on the 4284A SYSTEM CONFIG
page, highlight the value in the GPIB
ADDRESS field, and press 24 > Enter.
•
This sets the correct system GPIB address
(24) for the 4284A.
8 If present, on the 35670A front panel, press
Local/GPIB > ANALYZER ADDRESS > 22 >
ENTER.
•
This sets the correct system GPIB address
(22) for the 35670A.
9 If present, switch on the Agilent 4156C
precision semiconductor parameter analyzer
line power.
10 If present, switch on the 41501B expander
line power.
•
The expander must be switched on before
the 4156C.
11 Switch on the Agilent 4156C precision
semiconductor parameter analyzer line
power.
•
Ensure that the 41501B has already been
switched on prior to activating the 4156C.
12 On the 4156C, press System >
[MISCELLANEOUS], move the pointer to the
POWER LINE FREQUENCY field, and press
[50 Hz] or [60 Hz].
•
This ensures that the 4156C is configured to
match the available line power frequency.
•
The value is set to 60 Hz at the factory.
•
Use the front panel arrow keys to move the
cursor.