Installing the system, 2 installing the system – Atec Agilent-85133F User Manual
Page 63

63
Agilent 85225F Performance Modeling System
Installation and User’s Guide
Agilent Technologies
2
Installing the System
To prepare the installation site
To unpack the shipment crate containing the rack cabinet
To ensure your safety while using the system
Precautions for Performing Floating-Ground Measurements
Precautions for Avoiding Electrostatic Discharge
To switch on power to the system
This completes the installation process. To confirm the functionality of the
system, continue to Chapter 3, “Verifying System Functionality,”
starting on page 91.
89
Related Topics
“Introducing the Agilent 85225F Performance Modeling System"
Use this chapter to learn how to first prepare the installation site, and
then receive, unpack, install, and configure the system. This chapter
includes important information on operational safety, as well as
instruction on preparing the installation site, unpacking the system,
ensuring the completeness of the system shipment, installing the work
surface, performing final system configuration, and powering- on the
system.