beautypg.com

ATAS PC PANEL User Manual

Page 3

background image

PC System Panel

Anchor Clip

#12 x 1” Wafer
Head Screws

PCA91X
“Z” Closure

Shaped
Neoprene Closure

PCA36X
Shed Ridge Cap

PCA349
Shed Ridge
Starter Cleat

PC System Panel

Anchor Clip

#12 x 1” Wafer
Head Screws

ATA-Guard*

PCA91X
“Z” Closure

PCA980
Counterflashing

PCA500
Headwall
Trim

Appropriate
Anchor
Fasteners

PC System Panel

Anchor Clip

#12 x 1” Wafer
Head Screws

PCA91X
“Z” Closure

PCA30X/PCA31X
Ridge/Hip Cap

Neoprene Closure

Hip & Ridge Detail

Headwall Detail

Shed Ridge Detail

Hip and ridge applications are handled in the same
manner.

1. Cut “Z” closure to fit between seams and install

in butyl tape.

2. Fasten “Z” closure in bed of sealant at top of

panel. (Use 3 fasteners on 11 1/4” panel,
4 on 12 5/8”, 5 on 15 1/4”)

3. Seal neoprene strips into “Z” closures
4. Snap hip/ridge cap over “Z” closures for it to lock

into place. Pop-rivet one side only to allow for
expansion and contraction.

Notes:
* Trim must be pop-riveted to Z in at least

(1) location.

* Unless otherwise specified, all fasteners for trim

components at 2’-0” o.c.

* Install splice plates at ridge cap joints. Pop rivet

splice to one end of ridge cap to allow for
expansion and contraction.

Install appropriate underlayment to the edge.

1. In standard headwall situation (without venting),

run underlayment from roof plane up headwall.
Install panels up to headwall.

2. Cut “Z” closure to fit between seams and install

in butyl tape.

3. Fasten “Z” closure in bed of sealant at top of

panel. (Use 3 fasteners on 11 1/4” panel,
4 on 12 5/8”, 5 on 15 1/4”)

4. Seal formed neoprene closure into place in

“Z” closure.

5. Install headwall transition over “Z” closure.
6. Apply counterflashing over the headwall trim,

as required.

1. Install metal panel up to the roof peak.
2. Cut “Z” closure to fit between seams and install

in butyl tape.

3. Fasten “Z” closure in bed of sealant at top of

panel. (Use 3 fasteners on 11 1/4” panel,
4 on 12 5/8”, 5 on 15 1/4”)

4. Seal formed neoprene closure into place in

“Z” closure.

5. Fasten starter cleat to face of trim boards at

2” below ridge line.

6. Install shed ridge cap trim over “Z” closure

and starter cleat.