If the 24 V AC/DC supply is incorrectly connected, it may
represent a danger to life from electric shock. Pay attention to the
following points during installation:
The IQ S
ENSOR
N
ET
Universal Transmitter may only be
connected by a trained electrician.
The 24 V AC/DC supply must meet the specifications quoted on
the name plate and in chapter 9 T
(protective low
voltage SELV).
The connection of the IQ S
ENSOR
N
ET
Universal Transmitter to
the power supply may only be carried out when it is not
carrying any voltage.
When installed in a building, a switch or power switch must be
provided as an interrupt facility for the System 182.
The interrupt facility must
– be installed in the vicinity of the IQ S
ENSOR
N
ET
Universal
Transmitter, easily accessible by the user, and
– be labeled as the interrupt facility for the IQ S
ENSOR
N
ET
Universal Transmitter.
Note
Rechargeable battery systems should have a deep discharge
protection. The IQ S
ENSOR
N
ET
/24V does not have any built-in deep
discharge protection.
Materials required
Wire end sleeves, suitable for the 24 V AC/DC feed line, with
suitable crimping tool
1 x screwed cable gland with sealing ring (scope of delivery of the
Universal Transmitter).
Tools
Cable stripping knife
Wire stripper
Phillips screwdriver
Small screwdriver.
Preparing the 24 V AC/
DC line
1
Cut off the cable to the required length.
2
Strip the cable insulation for approx. 45 mm.
3
Bare the wires 1 and 2 and fit them with wire end sleeves.