Trial operation preparation

Cold water shut-off valve

Hot water

shut-off valve

Hot water heater

(Not included with the product)

Function module

Cold

water

water

Hot water

Power supply cord

(when flowing)

1

Confirm that electric power is

being supplied.

This should be performed after

confirming that the bathtub is empty.

2

Supply temperature: 140 to 158°F (60 to 70°C)

Supply pressure: 29 to 108.75 psi (0.20 to 0.75 MPa)

Supply water

pressure: 29 to 108.75 psi

(0.20 to 0.75 MPa)

(when flowing)

Open the hot and cold water shut-off valves connected

to the function module.

The position of the water shut-off valve will vary from place to place.

Please supply hot and cold water to the function module by opening the shut-off valves.

Hot water

Trial operation

Please run the unit in order of operations (1) to (6).

Do not apply pressure to the equipment itself.

(1) Bathtub data reset

Open the bathtub drain valve and empty the bathtub.

Set the On/Off button on the controller to OFF.

Turn the to ON.

Please open the drain valve of the bathtub so that no water remains in the bathtub.
The draining operations will end automatically after approximately 2 minutes.