Trial operation preparation, Trial operation, 1) bathtub data reset – Factory Direct Hardware Toto ABA990X#01FCP User Manual
Page 34
![background image](/manuals/291193/34/background.png)
34
■
Trial operation preparation
Cold water shut-off valve
Hot water
shut-off valve
Hot water heater
(Not included with the product)
Function module
Cold
water
water
Hot water
Power supply cord
(when flowing)
1
Confirm that electric power is
being supplied.
This should be performed after
confirming that the bathtub is empty.
2
Supply temperature: 140 to 158°F (60 to 70°C)
Supply pressure: 29 to 108.75 psi (0.20 to 0.75 MPa)
Supply water
pressure: 29 to 108.75 psi
(0.20 to 0.75 MPa)
(when flowing)
Open the hot and cold water shut-off valves connected
to the function module.
❈
The position of the water shut-off valve will vary from place to place.
Please supply hot and cold water to the function module by opening the shut-off valves.
Hot water
■
Trial operation
Please run the unit in order of operations (1) to (6).
❈
Do not apply pressure to the equipment itself.
(1) Bathtub data reset
➀
Open the bathtub drain valve and empty the bathtub.
➁
Set the On/Off button on the controller to OFF.
➂
Turn the to ON.
Please open the drain valve of the bathtub so that no water remains in the bathtub.
The draining operations will end automatically after approximately 2 minutes.