4. Installation Procedure
6-1 Building a base for the bathtub ~ seating the bathtub (P. 18, P. 19)
(1) Building a base (P. 18)
(2) Plumbing and connecting the drain pipes (P. 18)
(3) Seating the bathtub (P. 19)
6-2 Finishing (P. 20, P. 21)
(1) Fixing the bathtub in place (P. 20)
(2) Plumbing and connecting the hot/cold pipes and the fill-tub pipe (P. 20)
(3) Connecting the cables (P. 20)
(4) Finishing the tiles (P. 21)
6-3 Controller stand installation (P. 22)
(1) Marking the pilot hole, drilling the hole and installing the plug (P. 22)
(2) Attach the base (P. 23)
(3) Install the slip ring (P. 24)
(4) Controller stand installation (P. 25)
6-4 Function module installation (P. 26 to P. 32)
(1) Advance preparation (P. 26)
(2) Function module installation (P. 26)
(3) Positioning of holes for installing the function module installation screws (P. 27)
(4) Function module installation (P. 28)
(5) Plumbing the equipment (P. 28)
(6) Inspecting for leaks in the fill-tub plumbing (P. 29)
(7) Plumbing the hot, cold and fill-tub pipes (P. 30)
(8) Electrical work (P. 31, P. 32)
6-5 Confirmation and trial operation (P. 33 to P. 39)