(7) Plumbing the hot, cold and fill-tub pipes

Connect the pipes described so far to their respective connection ports on the function module.

Open the shut-off valves on the hot and cold water supply lines and check to see that there are no leaks from the
joints.

After connecting the cables and the bathtub equipment (Page 31), fill the tub and confirm that there is no water
leaking from the joints in the fill-tub pipes (two places: on the function module side and the bathtub side).

Freezing prevention (Please implement this in locations where there is a risk of the equipment or pipes freezing.)

• To prevent freezing, insulation (insulating material, electric heaters, etc.) should be used that is appropriate to the

region.

• Insulate the plumbing completely after checking to see that there are no leaks from the hot, cold or fill-tube water

lines.

• In order to be able to drain water from inside the pipes, do not wrap the water removal valve with insulation.

Insulate so that

there is no gap.

Wrap the insulation so that the water-

removal valve can be operated.

Insulate so that there

is no gap.

Anti-backwash valve

Shut-off valve

To bathtub

Water

Drain

Hot water (Water heater)

To drain line

Power supply cord