4) finishing the tiles – Factory Direct Hardware Toto ABA990X#01FCP User Manual
Page 21
21
(4) Finishing the tiles
●
Please build a deck around the perimeter with an apron and tiles.
❈
Before installing the deck, please fill the bathtub with water, test run it and check for leaks around the pipe
connections. Please refer to the POO concerning test runs.
❈
Before tiling the deck surface, determine the position of the remote control stand and insert a sheathing pipe for the
cable.
❈
Be sure to leave a gap in the space between the bathtub and the tiles and then fill in the gap between the bathtub
and the tiles using an alcohol-free type of silicone.
❈
Please arrange for a joint-backing material on site.
Also, when forming the deck apron, please be sure to affix the joint-backing material to the deck surface or the back
surface of the bathtub rim before putting the tub in place. It may not be possible to apply the joint-backing material
after the bathtub has been put in place.
Deck
Inspection port
(at least 15 x 15 inches)
Inspection port
(at least 15 x 15 inches)
Inspection port
(at least 15 x 15 inches)
Controller Stand Attachment Module
Tile insertion
Within
5 mm
Within
5 mm
Joint backing
material
Joint backing
material
Silicone
Silicone
Convoluted
Flexible
Tubing
Bathtub
within 3mm
Tile insertion