(4) Finishing the tiles

Please build a deck around the perimeter with an apron and tiles.

Before installing the deck, please fill the bathtub with water, test run it and check for leaks around the pipe
connections. Please refer to the POO concerning test runs.

Before tiling the deck surface, determine the position of the remote control stand and insert a sheathing pipe for the
cable.

Be sure to leave a gap in the space between the bathtub and the tiles and then fill in the gap between the bathtub
and the tiles using an alcohol-free type of silicone.

Please arrange for a joint-backing material on site.
Also, when forming the deck apron, please be sure to affix the joint-backing material to the deck surface or the back
surface of the bathtub rim before putting the tub in place. It may not be possible to apply the joint-backing material
after the bathtub has been put in place.

Deck

Inspection port

(at least 15 x 15 inches)

Inspection port

(at least 15 x 15 inches)

Inspection port

(at least 15 x 15 inches)

Controller Stand Attachment Module

Tile insertion

Within

5 mm

Within

5 mm

Joint backing

material

Joint backing

material

Silicone

Silicone

Convoluted

Flexible

Tubing

Bathtub

within 3mm

Tile insertion