Chapter 7: Roof Assembly

Figure 7-14 Purlin location 10

A

Left-hand upper roof rafter (CTR-0548)

F

1/2 x 1-3/4 in. flange bolt (S-10252)

B

1/2 x 1-3/4 in. flange bolt (S-10252)

G

1/2 in. flange nut (S-10253)

C

Right-hand upper roof rafter (CTR-0548)

H

Purlin (CTR-0563)

D

Right purlin clip (CTR-0316)

I

1/2 in. flange nut (S-10253)

E

Left purlin clip (CTR-0315)

Assembling Purlin Number 9

Purlin number 9 is located ninth from the eave.

Before You Begin

Place two roof rafters on the ground with roof panel holes facing up. Several A-frame assemblies will have
X-bracing installed and be placed periodically throughout the perimeter of the roof. Determine if X-bracing
is being installed and note those steps in this procedure.

What You Should Know

Pneg-4135A 135 Ft Diameter 40-Series Bin

93