Chapter 8: Accessories

Figure 8-17 Installing ladder brackets

B

Ladder assembly

J

5/16 in. hex bolt (S-275)

C

Starter bracket (RH LDR-4347)

K

Starter bracket (LH LDR-4346)

D

See sidewall hardware chart.

L

3/8 in. field drilled hole location

E

Approximately 18-3/4 in. (47.62 mm)

M

5/16 x 3/4 in. flange bolt (S-275)

F

3/8 in. field drilled hole location

N

5/16 in. flange nut (S-3611)

G

5/16 in. hex nut (S-396)

O

Standoff wedge (LDR-4198)

H

Standoff bracket (LDR-4314)

P

5/16 in. flange nut (S-3611)

I

Ladder reinforcing strap (LDR-5132)

Q

5/16 x 1 in. carriage bolt (S-3550)

Repeat this process for the remaining standoff brackets.

11.Field drill a 3/8 in. hole (L), and install hex bolts (M) and nuts (N), securing the ladder to the starter

brackets (C and K).

12.Tighten all hardware to the recommended torque specifications. See

Bolt Torque Specifications,

page 26

.

Pneg-4135A 135 Ft Diameter 40-Series Bin