beautypg.com

Chapter 7: roof assembly – Grain Systems Tanks PNEG-4135A User Manual

Page 85

background image

Chapter 7: Roof Assembly

Table 7-1 A-frame installation sequence and temperature cable locations for 135 ft diameter bin (cont'd.)

A-frame number

Rafter Number

Temp Cable Number

Radius Location

A3

R12

T8

32.2 ft

R13

A4

R36

T16

32.2 ft

R37

A5

R7

R8

T22

55.4 ft

A6

R32

T30

55.4 ft

R33

T15

32.2 ft

A7

R26

T28

55.4 ft

R27

T13

32.2 ft

A8

R16

R17

T25

55.4 ft

A9

R42

T18

32.2 ft

R43

A10

R40

R41

T33

55.4 ft

A11

R18

T10

32.2 ft

R19

A12

R28

R29

T29

55.4 ft

A13

R5

T21

55.4 ft

R6

T6

32.2 ft

A14

R44

T34

55.4 ft

R45

T19

32.2 ft

A15

R20

T26

55.4 ft

R21

T11

32.2 ft

A16

R24

T12

32.2 ft

R25

A17

R3

T5

32.2 ft

R4

A18

R38

T32

55.4 ft

R39

T17

32.2 ft

A19

R14

T24

55.4 ft

R15

T9

32.2 ft

A20

R34

T4

12.3 ft

R35

T31

55.4 ft

A21

R30

T14

32.2 ft

R31

Pneg-4135A 135 Ft Diameter 40-Series Bin

85