beautypg.com

Installing wind rings – Grain Systems Tanks PNEG-4135A User Manual

Page 185

background image

Chapter 8: Accessories

Figure 8-29 Dimensions for OSHA Compliant Ladder Rung Placement

NOTE: Ensure the wind rings are installed in rela-

tion to the ladder rungs as shown to meet
O.S.H.A. specifications.

Installing Wind Rings

Installation of wind rings is similar for a two and a three post bin design, although hardware quantities may
vary.

What You Should Know

Before installing, determine the bin size, sidewall gauge thickness, and height. Use the hardware chart to
match the correct bolt length with the correct sidewall gauge thickness when installing the wind ring brack-
ets to the stiffeners (Refer to hardware requirements chapter). To determine the location of the wind rings
or if additional wind rings will be needed for sidedraw systems, see

Wind Ring Requirements for Sidedraw

Systems

.

Pneg-4135A 135 Ft Diameter 40-Series Bin

185