beautypg.com

Weil-McLain 550-141-826/1201 User Manual

Page 3

background image

HOMEOWNER and SERVICE TECHNICIAN — read and follow completely.

Contents

Using this manual . . . . . . . . . . . . . . . . . . . . .2

When calling or writing about the boiler . . . . . . . .2
Packaged and non-packaged boilers. . . . . . . . . .2

Hazard definitions . . . . . . . . . . . . . . . . . . . . .2
Contents . . . . . . . . . . . . . . . . . . . . . . . . . .3
Please read before proceeding . . . . . . . . . . . . . .4

Tips for water systems — . . . . . . . . . . . . . . .4

Routine maintenance schedule. . . . . . . . . . . . . .5

Beginning each heating season . . . . . . . . . . . .5
Daily during heating season . . . . . . . . . . . . . .5
Weekly during heating season . . . . . . . . . . . . .5
End of heating season . . . . . . . . . . . . . . . . .5
Boiler shutdown . . . . . . . . . . . . . . . . . . . .5

Operation. . . . . . . . . . . . . . . . . . . . . . . . . .6

WGO (see Figure 1) . . . . . . . . . . . . . . . . . .6

Troubleshooting . . . . . . . . . . . . . . . . . . . . . .7
Before installing boiler . . . . . . . . . . . . . . . . . .8

Installations must comply with . . . . . . . . . . . . .8
Before selecting boiler location. . . . . . . . . . . . .8
Provide clearances around boiler
(see Figure 2) . . . . . . . . . . . . . . . . . . . . .8
Provide air for combustion and ventilation . . . . . . .9
Foundation . . . . . . . . . . . . . . . . . . . . . . .9

Install boiler — packaged boilers only . . . . . . . . . 10

Place boiler. . . . . . . . . . . . . . . . . . . . . . 10
Perform hydrostatic pressure test . . . . . . . . . . 10

Install boiler — non-packaged boilers only . . . . . . 12

Place boiler. . . . . . . . . . . . . . . . . . . . . . 12
Perform hydrostatic pressure test . . . . . . . . . . 14
Install jacket
(sizes 7 through 9 only) . . . . . . . . . . . . . . . 14
Install boiler controls . . . . . . . . . . . . . . . . . 14

Install burner — all boilers . . . . . . . . . . . . . . . 15

Install burner
(also refer to instructions packed with burner) . . . . 15

Connect breeching . . . . . . . . . . . . . . . . . . . 16

General chimney requirements. . . . . . . . . . . . 16

Connect water piping . . . . . . . . . . . . . . . . . . 18

General piping information . . . . . . . . . . . . . . 18
Install piping . . . . . . . . . . . . . . . . . . . . . 18
DIAPHRAGM expansion tank (Figure 9, page 19) . . 18

CLOSED expansion tank (Figure 10, page 19) . . . 18
To connect WGO boilers to indirect-fired
water heaters. . . . . . . . . . . . . . . . . . . . . 18
Piping MULTIPLE ZONES . . . . . . . . . . . . . . 20
Piping for systems requiring
temperatures below 140°F . . . . . . . . . . . . . . 21
Use with refrigeration systems . . . . . . . . . . . . 22

Connect wiring. . . . . . . . . . . . . . . . . . . . . . 22

General wiring requirements . . . . . . . . . . . . . 22
Thermostat wiring . . . . . . . . . . . . . . . . . . 22
3-Wire zone valve applications . . . . . . . . . . . . 22
Junction box (furnished) . . . . . . . . . . . . . . . 23
Burner wiring . . . . . . . . . . . . . . . . . . . . . 23
High temperature limit . . . . . . . . . . . . . . . . 23

Connect wiring — blocked vent
shutoff switch option . . . . . . . . . . . . . . . . . . 25

Blocked vent shutoff switch . . . . . . . . . . . . . 25

Connect oil piping . . . . . . . . . . . . . . . . . . . . 26

General oil piping requirements . . . . . . . . . . . 26
Oil piping connection at burner. . . . . . . . . . . . 26

Start-up. . . . . . . . . . . . . . . . . . . . . . . . . . 27

Fill the system . . . . . . . . . . . . . . . . . . . . 27
When using antifreeze . . . . . . . . . . . . . . . . 27
To place in operation . . . . . . . . . . . . . . . . . 27

Check-out procedure . . . . . . . . . . . . . . . . . . 28

Check off steps as completed . . . . . . . . . . . . 28
Installation and service certificate . . . . . . . . . . 28

Annual service check list . . . . . . . . . . . . . . . . 29

Controls requiring annual service . . . . . . . . . . 29

Detailed service procedures . . . . . . . . . . . . . . 30

Cleaning boiler flueways . . . . . . . . . . . . . . . 30
General description of control operation . . . . . . . 30

Handling ceramic fiber and fiberglass materials . . . 31
Close clearance installation . . . . . . . . . . . . . . 32

Close clearance installation . . . . . . . . . . . . . 32
Burner adjustments for packaged
and non-packaged boilers . . . . . . . . . . . . . . 32

Replacement parts . . . . . . . . . . . . . . . . . . . 34
Dimensions . . . . . . . . . . . . . . . . . . . . . . . 40
Ratings . . . . . . . . . . . . . . . . . . . . . . . . . . 42
Notes . . . . . . . . . . . . . . . . . . . . . . . . . . . 43

Part number 550-141-826/1211

3

GOLD

WGO

OIL-FIRED NATURAL DRAFT WATER BOILER — SERIES 3 —

Boiler Manual