beautypg.com

Boiler manual – Weil-McLain 550-141-826/1201 User Manual

Page 25

background image

SERVICE TECHNICIAN ONLY — read and follow completely.

Connect wiring — blocked vent shutoff switch option

Figure 18

Blocked vent shutoff switch installation

Figure 19

BVSS wiring diagram

Blocked vent shutoff switch

In Canada, blocked vent shutoff switch kit

(see parts list page 34) must be installed.

See Figure 18. The wiring diagram in

Figure 19 shows boiler wiring only up

to the burner disconnect. For additional

information, refer to manufacturer’s

instructions.

Electric shock hazard. Turn off electrical

power supply at service entrance panel

before making any electrical connections

to avoid possible electric shock hazard.

Failure to do so can cause severe personal

injury or death.

After installing BVSS switch, proceed as follows:

1. Disconnect power.

120 vac
field wiring

Low voltage
field wiring

120 vac
factory wiring

Low voltage
factory wiring

2. Install Spill Switch (BVSS) Wiring Harness (P/N 591-391-942) as fol-

lows:
a. Remove cover from BVSS Box.
b. Install straight fitting end of the harness on the BVSS Box. Install

elbow (90º) end fitting on the Boiler Junction Box (see Figure 18).

c. Install both the fork ends to the screw terminals on the BVSS Switch

as per the wiring diagram, (see Figure 19).

d. Replace BVSS box cover.
e. Locate Combination Control, remove cover, and disconnect red

wire from “B1” terminal.

f. If red wire from Step “e” has uninsulated female end, replace it

with insulated female end as supplied in kit.

g. Connect female end of Spill Switch BVSS Harness (blue wire) to

“B1” terminal.

h. Connect male end of Spill Switch BVSS Harness to the red wire

removed in Step “e”.

i. Replace Combination Control Cover.

3. Turn on power and verify safe operation of the appliance.
4. Restore boiler to normal operation.

Part number 550-141-826/1211

25

GOLD

WGO

OIL-FIRED NATURAL DRAFT WATER BOILER — SERIES 3 —

Boiler Manual