2.4.1 Pre-Installation Considerations
Fast Ethernet Topology Considerations
If you will be using the Switch for Fast Ethernet (100 Mbps) operation, observe the following guidelines:
The maximum unshielded twisted-pair (UTP) cable length is 100 meters (328 feet) over Category 5
cable.
Single-repeater topologies permit a total network span of 325 meters (1066 feet).
Full-Duplex Considerations
The Switch provides full-duplex support for its Fast Ethernet ports. Full-duplex operation allows frames
to be sent and received simultaneously, doubling a link’s potential data throughput. If you will be using
the Switch in full-duplex mode, the maximum UTP cable length is 100 meters (328 feet) over Category
5 cable.
2.4.2 Desktop or Shelf Mounting
To install the Switch on a desktop or shelf, simply complete the following steps:
Step 1
Place the Switch on a desktop or shelf near an AC power source.
Step 2
Keep enough ventilation space between the Switch and the surrounding objects.
Note:
When choosing a location, keep in mind the environmental restrictions. Please also
refer to Chapter 1, section 1.3 product specification for the details.
Step 3
Connect the Switch to network devices.
A.
Connect one end of a standard network cable to the 10/100 RJ-45 ports on the front of
the Switch.
B.
Connect the other end of the cable to the network devices such as printer servers,
workstations or routers.
C.
Note:
It is strongly recommended to use the UTP Category 5 network cabling with RJ-45 tips
for the network connection. For more information, please see the Cable Specifications
in Appendix A, Cable Specifications.
Step 4
Supply power to the Switch.
A.
Connect one end of the power cable to the Switch.
B.
Connect the power cube end of the power cable to a standard wall outlet.
When the Switch receives power, the Power LED should remain solid Green.