Run Cables to Base Station Locations

The Base Station locations should be designated on the building floor

plans provided to the Polycom field service engineer. Base Stations

can be mounted easily on raised or acoustical ceiling tiles, or on the

wall. Avoid locating Base Stations in high or hard-to-reach places, as

this will hinder maintenance, testing and/or repositioning.

Wire specifications

The customer’s wire contractor is responsible for adhering to all
local codes for wiring.

Polycom recommends UL-listed wire that conforms to the following

specifications for AWG, distance, and number of power pairs

required for this installation.

Power

Pairs

Max Cable Feet

22 AWG

Max Cable Feet

24 AWG

Max Cable Feet

26 AWG

1

1,100

750

470

2

2,200

1,500

940

3

2,200

2,200

1,400

One additional pair is required for data.

Attenuation must not exceed 6.8 dB/1,000 feet at 772KHz.

Wire that is already installed (spare house cable) can be used when it

is available. House cable will usually run from the MDF in the

telephone equipment room to intermediate distribution frames (IDFs)

spread throughout the facility. Install new wire from the closest IDF

to the Base Station. Be sure no bridge taps, multiples, or “Y”

connections are created or present.