Site preparation, Required materials provided by customer – Polycom SpectraLink SCM408 User Manual
Page 15
PN: 1725-36097-001_L.doc
15
Site Preparation
Required Materials Provided by Customer
The following equipment must be provided by the customer:
Outlet Strip
Recommended for installations with more than one
MCU. This will allow the MCUs to be turned on and off together.
Cross-Connect Block
Required to connect the telephone switch
ports and the Base Stations to the MCU.
25 Pair Cables
RJ-21 male at MCU end, required to connect the
MCU to the cross-connect blocks.
Backboard Space
The MCU is designed to be wall mounted to
3/4” plywood securely screwed to the wall.
Base Station Mounting Hardware
If the Base Stations will be
mounted on finished walls or ceilings, a 4 to 5” long 1/4” bolt,
nuts, and washers will be required for each Base Station mounted.
3
- SpectraLink SCE408 SpectraLink SCT416 SpectraLink 1725-36097-001 SpectraLink SCA516 SpectraLink SCK416 SpectraLink SCA408 SpectraLink SCJ408 SpectraLink SCI416 SpectraLink SCN416 SpectraLink SCO416 SpectraLink SCJ416 SpectraLink SCO408 SpectraLink SCS416 SpectraLink SCI408 SpectraLink RCC400 SpectraLink SCK408 SpectraLink SCL408 SpectraLink RCU201 SpectraLink SCA416 SpectraLink SCL416 SpectraLink MOG400 SpectraLink SCM416 SpectraLink SCC408 SpectraLink SCC416 SpectraLink SCD416 SpectraLink SCF416 SpectraLink SCN408 SpectraLink SCE416 SpectraLink SCF4089 SpectraLink SCX416 SpectraLink SCD408