Installation Forms

This section contains the following forms:

Site Preparation Checklist

Base Station Location Worksheet

Extension Assignments Worksheet

Customer Acceptance Form

Copy these forms as needed. Be sure to maintain completed forms for

future reference.

Site Preparation Checklist

If upon arrival the Polycom field service engineer determines that the

pre-installation work has not been completed correctly, the engineer

has two options: 1) the engineer can leave the site and reschedule the

installation when the action items have been completed or corrected,

or 2) the engineer can assist in preparing the site, and thus spend

additional time installing the system. Because of the additional cost

incurred by Polycom in executing either option, the customer will be

billed for the additional time at the standard hourly rate plus

expenses.
Please be sure the following items are completed.

MCU location prepared. Typically the MCU is installed in the

telephone equipment room. This location must have sufficient

rack or backboard space and power available.

Two-pair wires are run to each of the Base Station locations as

designated on the building floor plans. Use Level 3 cable for

lengths up to 3,500 feet; Level 4 for lengths up to 6,000 feet.

The Base Station cables are terminated with RJ-45 crimp-on plugs

at the designated locations.

One (or two) cross-connect block(s) are installed for every

Interface Module and connected with a 25-pair Telco cable

terminated with an RJ-21 male connector at the MCU location.