Site certification – Polycom SpectraLink RCO400 User Manual
Page 57
PN: 1725-36122-001_N.doc
57
Site Certification
The Polycom field service engineer should not leave the site before
contacting Polycom to perform remote install verification.
The field service engineer should contact a Polycom engineer on the
technical support line at 800-775-5330. The hours of operation are 6
a.m. to 6 p.m. Mountain time, Monday through Friday.
Before leaving the installation site, the field service engineer must
complete the following items:
From the Operator’s Console, copy the PCS.CFG file to diskette.
From the Operator’s Console, press F1 (Supervisor State Display)
then select
Dump Config to PCS.CFG
. See SpectraLink 6300 MCU:
Operator’s Console Chapter 5, section Dump Config to Disk for more
information.
Give the system administrator a map of the system showing the
final Base Station locations.
Perform end-user training.
Perform administrative training and get a signature on the
acceptance document. This document confirms that the
installation has been correctly carried out, that the coverage area is
correct, and that the client’s personnel have been trained.
The installation is not complete until all certification steps have been
performed. SpectraLink 6000 Wireless Telephones should not be
handed out until the site has been certified.
9