beautypg.com

Install shelves, Rack mount, Wall mount – Polycom SpectraLink RCO400 User Manual

Page 41

background image

System Installation

PN: 1725-36122-001_N.doc

41

Install Shelves

Rack mount

To install shelves in the rack, slide the shelves into the rack and secure

them to the rack using 8 screws, 1/4” minimum length.

Wall mount

At this point in the installation process, there should be a backboard

securely fastened to the wall and mounting screws partially inserted

into the backboard. See Chapter 4, section Prepare Location for

Shelves for more information.
To attach the shelves to the wall:

1. Remove all cards from the shelf. Do not mount the shelf with

cards installed.

Cards contain components that may be damaged by electrostatic
discharge. Before handling any of the cards, attach the grounding
strap (included in the Administration Kit) to your wrist, and attach
the other end of the strap to ground. Handle cards only by their
edges. Do not touch connector contact areas. Do not lift cards by
any of the components. Do not lay cards down on their component
sides. When laying a card down, place it component side up, on top
of the anti-static bag in which it was shipped.

2. Position the MCS300 so that the six mounting screws are aligned

with the six keyhole openings in the back of the shelf.

3. Slide the shelf down onto the screws to lock the shelf into place.

Check that all six screws are properly locked.

4. Tighten all six screws fully.

Do not install cards until power is connected.