Install shelves, Rack mount, Wall mount – Polycom SpectraLink RCO400 User Manual
Page 41
System Installation
PN: 1725-36122-001_N.doc
41
Install Shelves
Rack mount
To install shelves in the rack, slide the shelves into the rack and secure
them to the rack using 8 screws, 1/4” minimum length.
Wall mount
At this point in the installation process, there should be a backboard
securely fastened to the wall and mounting screws partially inserted
into the backboard. See Chapter 4, section Prepare Location for
Shelves for more information.
To attach the shelves to the wall:
1. Remove all cards from the shelf. Do not mount the shelf with
cards installed.
Cards contain components that may be damaged by electrostatic
discharge. Before handling any of the cards, attach the grounding
strap (included in the Administration Kit) to your wrist, and attach
the other end of the strap to ground. Handle cards only by their
edges. Do not touch connector contact areas. Do not lift cards by
any of the components. Do not lay cards down on their component
sides. When laying a card down, place it component side up, on top
of the anti-static bag in which it was shipped.
2. Position the MCS300 so that the six mounting screws are aligned
with the six keyhole openings in the back of the shelf.
3. Slide the shelf down onto the screws to lock the shelf into place.
Check that all six screws are properly locked.
4. Tighten all six screws fully.
Do not install cards until power is connected.