Installation steps and responsibilities – Polycom SpectraLink RCO400 User Manual

Page 10

background image

SpectraLink 6300 MCU: Facility Preparation

PN: 1725-36122-001_N.doc

10

Installation Steps and Responsibilities

Task

Description

Wire

Contractor or

Electrician

Field Service

Engineer

Customer

Project Mgr/

Sys Admin

Site Preparation

Required materials provided by customer

Prepare location and arrangement of
shelves

Prepare –48V power for shelves

Run cables to Base Stations

Terminate cables at Base Stations

Prepare and install demarc blocks

Program Telephone System ports

Connect cables from Base Stations and
phone lines to demarc blocks

Wire demarc blocks for Interface Modules

Install Shelves and Interface Modules

Survey site and check components

Install shelves

Install junction panel

Connect power to shelves

Install cards in shelves

Connect junction panel

Connect demarc blocks to Interface
Modules

Install Base Stations

Install Base Stations in ceilings

Install Outdoor Base Stations

Check system diagnostics

Initialize System

Program handset features

Test System and Certify Site