beautypg.com

Install base stations, Mount base stations on dropped tile ceilings – Polycom SpectraLink RCO400 User Manual

Page 49

background image

PN: 1725-36122-001_N.doc

49

Install Base Stations

Be sure the Base Station is positioned clear of anything that might

damage it. The Base Station should be well above head height, away

from doors and other objects that might strike it, and away from areas

open to the elements or possible water leaks.
Check the location for other radio antenna devices and place the Base

Stations to avoid interference. Leave enough slack wire to account for

possible future Base Station moves.

Mount Base Stations on Dropped Tile Ceilings

A ceiling clip and plastic bolt are supplied to install Base Stations on

the drop ceiling rails (T-bars) used to support acoustical tile. The

plastic bolt screws into the top of the Base Station, then snaps into the

ceiling clip which has been attached to the rails that hold the

acoustical tile. The fastener is designed for use on 15/16" wide rails.

1. Attach the metal fastener to the rail (T-bar) supporting the

dropped ceiling by rotating it into position until it snaps into the

locked position.

2. Screw the plastic bolt to the 1/4” x 20 captive nut into the top of

the Base Station.

3. Slide the bolt into the exposed prongs of the metal clip until it

snaps into position.

6