beautypg.com

Mount base stations on finished ceilings – Polycom SpectraLink RCO400 User Manual

Page 50

background image

SpectraLink 6300 MCU: Facility Preparation

PN: 1725-36122-001_N.doc

50

4. When properly attached the Base Station should sit almost flush

against the ceiling and be tightly attached to the clip and T-bar

grid work.

5. Once the Base Station is anchored to the fastener, lift the acoustical

tile and plug the RJ-45 8-pin modular plug into the connector on

the top of the Base Station.

The LED will blink red and green as the system software

downloads to the Base Station and the Base Station is tested.

When the LED blinks amber, the system is ready for operation.

When the LED blinks green, a handset has established a radio

link with that Base Station.

If the LED turns solid red or other red/green sequence, refer

to SpectraLink 6300 MCU Maintenance and Diagnostics.

Mount Base Stations on Finished Ceilings

If this site does not have a dropped tile ceiling, the Base Station can be

mounted to a finished ceiling or wall with a 4 to 5” long 1/4” -20 TPI

plastic or nylon screw or bolt (such as a lag screw).

The customer’s wire contractor is responsible for this installation.

1. Drill two holes approximately 1” apart. Make the holes large

enough to accommodate the RJ-45 connector and a bolt to secure

the Base Station.

2. Insert a wide washer above the ceiling, then screw the bolt into

the beam or ceiling.

3. Insert three nuts on the bolt, then screw the Base Station into the

bolt, being careful not to insert the bolt more than 1/3”, five full

turns, into the Base Station.

If the ceiling is open with I-beams or pipe construction, mount the

Base Station with I-beam clamps or pipe clamps.