SpectraLink 6300 MCU: Facility Preparation

PN: 1725-36122-001_N.doc

22

unlimited access to the Customer Support Hotline for additional

assistance.

Union labor

In some areas strict labor union rules will preclude the Polycom

representative’s ability to install the equipment without union

assistance. If such rules are in force in the local area, the customer

must ensure that sufficient union help is available at the scheduled

installation time to carry out the following functions:

Install Base Stations

Move and reinstall Base Stations

Make cabling changes at cross-connect blocks

Run cables

Make and modify electrical connections

Prepare Location for Shelves

Polycom recommends an operational temperature range of 0

º–

40

º C (31º–104º F). Optimal temperature is 20º C (68º F). Humidity

recommendation is 20%– 80% (non-condensing).

The MCU, composed of up to 20 shelves and one Intershelf Junction

Panel, is usually installed in or near the telephone equipment room. If

this is not possible, the MCU can be located anywhere that the

telephone system lines are accessible.
The number and arrangement of the system shelves depends on the

size and configuration of the system.

System Controller

Part Number

Shelves

Supported

Base Stations

Supported

Users

Supported

CSC301/ CSO301

1

60

160

CSC306/ CSO306

6

360

960

CSC320/ CSO320

20

1,000

3,200

Consideration should be given to:

Environmental conditions. The system outputs 28 BTUs per hour,

per interface module.

Space for the backboard or rack.