Environment considerations, Inspecting and unpacking each cabinet – Powerware 5075 kVA User Manual
Page 18
10
Powerware BPIII Harsh Environment UPS 50--75 kV Installation and Operation
164291261 Rev. F 111503
Environment Considerations
The UPS system must be installed on a sealed concrete floor.
WARNING:
Installation should be performed by qualified personnel.
Inspecting and Unpacking Each Cabinet
The first task in preparing for installation is inspecting and unpacking each cabinet.
Cabinets arrive covered with protective packaging material as shown in Figure 2.
FOAM CUSHION
OUTER
PACKAGING
Figure 2. Cabinet as Shipped, with Outer Packaging and Pallet
1.
Carefully inspect the outer packaging for evidence of damage during transit.
CAUTION:
Do not install a damaged cabinet. Report any damage to the carrier and
contact your local sales or service office immediately.