beautypg.com

Powerware 5075 kVA User Manual

Page 138

background image

DESCRIPTION:

DATE:

DRAWING NO:

5 of 11

INSTALLATION NOTES

SHEET:

REVISION: B

011500

164201261---1

A---6

Powerware BPIII Harsh Environment UPS 50--75 kV Installation and Operation

164291261 Rev. F 111503

Table E. External Power Cable Terminations

Terminal Function Voltage

Terminal

Function

Size of Pressure

Termination

Tightening

Torque

N---M (lb---in )

Int Hex

Size

(In.)

AC Input to

UPS (CB1)

E33

Phase ‘A’

2 --- 3/0---250 kcmil

42.4 (375)

3/8

UPS (CB1)

208

E34

Phase ‘B’

2 --- 3/0---250 kcmil

42.4 (375)

3/8

E35

Phase ‘C’

2 --- 3/0---250 kcmil

42.4 (375)

3/8

480

E33

Phase ‘A’

1 --- #4---300 kcmil

42.4 (375)

3/8

480

600

E34

Phase ‘B’

1 --- #4---300 kcmil

42.4 (375)

3/8

600

E35

Phase ‘C’

1 --- #4---300 kcmil

42.4 (375)

3/8

AC Input to

B pass

208

E19

Phase ‘A’

1 --- #4---300 kcmil

42.4 (375)

3/8

Bypass

208

480

600

E20

Phase ‘B’

1 --- #4---300 kcmil

42.4 (375)

3/8

600

E21

Phase ‘C’

1 --- #4---300 kcmil

42.4 (375)

3/8

AC Output to

C itical Load

E25

Phase ‘A’

1 --- #4---300 kcmil

42.4 (375)

3/8

Critical Load

208

480

E26

Phase ‘B’

1 --- #4---300 kcmil

42.4 (375)

3/8

480

600

E27

Phase ‘C’

1 --- #4---300 kcmil

42.4 (375)

3/8

600

E12

Neutral/Gnd. 2 --- #4---500 kcmil

31.1 (275)

3/8

DC Input from

Batte

120

E31

Battery (+)

3 --- 2/0---400 kcmil

42.4 (375)

3/8

Battery

120

E32

Battery (---)

3 --- 2/0---400 kcmil

42.4 (375)

3/8

Customer

Ground

N/A

Ground Ground

2 --- #6---350 kcmil

31.1 (275)

3/8

11.

The UPS and the Environmental cabinets are normally crated separately for shipping and

are bolted together on site.

12.

Do not tilt cabinets more than 10˚ during handling.

13.

Dimensions are in millimeters (inches).

14.

Table F lists the ventilation requirements for full load operation:

Table F.

Air Conditioning or Ventilation

Requirements During Full Load Operation

Ratings

Heat Rejection

BTU/hr (Kg---cal/hr)

50--- 75 KVA

23,000 (5796)

15.

Recommended minimum clearance over the UPS module is 304.8 mm (12 in.).

Required for cooling air exhaust: approximately 614.0 liters/sec (1300 cfm).