Promise Technology VTrack M-Class M200i User Manual
Page 290

VTrak M-Class Product Manual
282
Rebuild
Rebuild is started
Result of settings or user action. Normal.
Rebuild is completed
Normal.
Rebuild is paused
Rebuild paused because of user intervention, 
schedule or a higher priority background activity.
Rebuild is resumed
Rebuild has resumed again after a pause.
Rebuild is stopped
Rebuild stopped because of user intervention, 
schedule or the logical drive was deleted or the target 
disk drive encountered an error. If rebuild stopped by 
user intervention, restart the rebuild. See page 138.
Rebuild stopped internally The logical drive is offline. See page 286.
Rebuild is aborted due to 
an internal error.
System resources are low. Reduce system load or 
restart the VTrak. See page 218.
Rebuild is queued
Rebuild has been set manually or by schedule.
Rebuild marks logical 
drive synchronized upon 
rebuild completion
Result of successful rebuild. Normal.
Redundancy Check
Redundancy Check is 
started
Redundancy Check has started manually or by 
schedule.
Redundancy Check is 
completed
Redundancy Check has finished.
Redundancy Check is 
paused
Redundancy Check paused because of user 
intervention, schedule or a higher priority background 
activity.
Redundancy Check is 
resumed
Redundancy Check has resumed again after a 
pause.
Redundancy Check is 
stopped
Redundancy Check stopped because of user 
intervention, schedule or the logical drive was deleted 
or went critical or offline.
Redundancy Check is 
aborted due to internal 
error
System resources are low. Reduce system load or 
restart the VTrak. See page 218.
Redundancy Check 
encountered inconsistent 
block(s)
Check the logical drive’s inconsistent block table. See 
page 147. Rebuild the disk array if necessary. 
page 138.
Event
Action
