Chapter 2: installation, Unpack the vtrak – Promise Technology VTrack M-Class M200i User Manual
Page 19

11
Chapter 2: Installation
•
Unpack the VTrak storage subsystem (below)
•
Mount VTrak M500f/i/p in a Rack (page 12)
•
Mount VTrak M300f/i/p or M200f/i/p in a Rack (page 14)
•
•
Set Up Network Cable Connections (page 20)
•
Set Up Serial Cable Connections (page 25)
•
Unpack the VTrak
The VTrak box contains the following items:
•
VTrak Unit
•
Quick Start Guide
•
Null Modem Cable
•
Left and right mounting rails
•
1.0m External VHDCI SCSI
cables (2 for M500p/M300p, 1
for M200p)
•
Screws for disk drives
(36 for M200f/i/p; 52 for M300f/i/p;
64 for M500f/i/p; including 4 spares)
•
1.5m (4.9 ft) Power cords (2)
•
CD with SNMP files, Product
Manual and Quick Start Guide
Warning
The electronic components within the VTrak disk array are
sensitive to damage from Electro-Static Discharge (ESD).
Observe appropriate precautions at all times when handling the
VTrak or its subassemblies.
Important
Use the following categories of network cables with VTrak:
•
Cat 6, preferred
•
Cat 5E, minimum