beautypg.com

Control system unresponsive, Uim (lcd) is blank, Uim is inoperable – State Industries SHE50-100PE User Manual

Page 59: Uim (lcd) is blank uim is inoperable, Uim is inoperable on

background image

57

Servicing should only be performed by a Qualified Service Agent

control system unresponsive

displayed message/condition/indicates

possible causes - checK/repair

UIM (lCD) Is Blank

The LCd on the uIM is not showing any data. The water

heater may be running and maintaining hot water or it

may not be operational. Causes for this include:

• on/off switch is turned off.
• Water heater is not plugged in.
• Tripped breaker - blown fuses.
• 120 VAC power supply problems.
• 24 VAC power supply problems.
• defective transformer.
• Wiring or plug/socket connection problems.
• uIM communication cable defective.

Important Service Reminder:

When performing any troubleshooting steps outlined in

this manual always consider the wiring and connectors

between components. Perform a close visual inspection

of all wiring and connectors to a given component before

replacement.

• Ensure the water heater's on/off switch is in the "on"

position and is working properly - replace switch if

defective.

• Ensure the circuit breaker supplying power to the

water heater is turned on.

• Check for any blown fuses in the power supply to the

water heater.

• Ensure the water heater is plugged in to a 120 VAC

wall outlet on models equipped with a standard

appliance cord.

• on installations using a 120 VAC wall outlet for

power, ensure there is 120 VAC at the wall outlet, see

Electrical Requirements on page 6.

• Ensure 120 VAC power is properly connected in the

junction box on the back of the water heater, see

Electrical Requirements on page 6.

• Check communication cable connections at uIM’s

J2 Socket (page uIM (user Interface Module) on

page 37) and the CCB’s J16 Socket (page 41). Secure

power and install a new comm cable (standard Cat 5

network cable).

• Closely inspect communication ports on CCB and

uIM for damage or wear.

• Ensure 120 VAC is supplied to CCB’s J3 Socket pins

1 & 3. Hot wire to pin 1, neutral wire to pin 3 (page 41).

• Check 120 VAC to transformer primary winding at

CCB’s J1 socket pins 1 & 3 (page 41) with J1 plug

removed, power on.

• Check J1 plug and J1 socket on the CCB for wear

or damage. Ensure plugs and sockets are mating

properly and providing good contact.

• Check for 24 VAC from transformer secondary

winding at CCB’s J1 socket pins 4 & 5 with J1 plug

inserted, power on. If 24 VAC is not present and the

two checks above were performed and the results

were successful - replace the transformer. Check

all wiring for shorts before powering up the new

transformer.

• Call the toll free support phone number on the back

cover of this manual for further assistance if the

problem has not been corrected after performing the

procedures outlined here.

UIM Is Inoperable

Information is displayed on the uIM's LCd screen but the

user input buttons do not respond when pressed. unable

to navigate Control System.
Water heater may be maintaining water temperature at

the last saved setting or may not be operating at all.

• Ensure Ribbon Cable from the Button Pad overlay

is inserted correctly into the uIM J3 Socket, see uIM

(user Interface Module) on page 37. If this Ribbon

cable is not connected properly it will render some/all

of the user input buttons on the uIM inoperable.

• Call the toll free support phone number on the back

cover of this manual for further assistance if the

problem has not been corrected after performing the

procedures outlined here.

This manual is related to the following products: