beautypg.com

Ccb circuit board layout, Ccb circuit, J6 j7 – State Industries SHE50-100PE User Manual

Page 43: J3 j5 j4, S1 dipswitch detail ccb (central control board), Ope n 1 2 3 4, Figure 41

background image

41

Servicing should only be performed by a Qualified Service Agent

ccb circuit board layout

1 Retry

Use

Yes

Type Tstat

Spare

Ext

Input

3

Retries

No

Vent

Spare

O

PE

N

1

2

3

4

3

2

1

6

5

4

9

8

7

12

11

10

15

14

13

J6

J7

3

2

4

1

1

2

J15

8

4

5

6

7

1

2

3

J13

3

4

1

2

J10

1

3

5

2

4

J1

1

3

4

2

J2

1

4

2

1
2

J3

J5

J4

S1 DIPSWITCH

J16

J9

J11

S1 DIPSWITCH DETAIL

CCB (CENTRAL CONTROL BOARD)

1 Retry

Use

Yes

Type Tstat

Spare

Ext

Input

3

Retries

No

Vent

Spare

O

PE

N

1

2

3

4

Dipswitch Operation:

Along one side of the dipswitch array there are numbers, 1-4. On the other side of the dipswitch

is the word “OPEN.” The dipswitches are rocker type switches, if one side of the rocker is down the

other side will be up. Pressing a rocker down on the side of the array labeled “OPEN,” opens the switch.

Pressing a rocker down on the side of the array labeled with the numbers 1-4 closes the dipswitch.

CHANGING NUMBER OF IGNITION TRIALS BEFORE LOCK OUT

NOTE: Always turn off power to the water heater before changing dipswitch settings.

Set dipswitch #4 to the open position for 1 trial for ignition before Ignition Failure lock out. Set dipswitch

#4 to the closed position for 3 trials for ignition before Ignition Failure lock out.

Figure 41

This manual is related to the following products: